A big Thank you to Leanne (Phil’s girlfriend) and Phil Hersey for coming up last Sunday along with Tony and me for another working day, Leanne and Phil will be unable to make the next official day 18th Jan so offered their help in advance.
Just to bring you up to date;
- We have now cut back hedging and trimmed the lower tree branches along the entire length of the right hand side (looking at the club house from the road), the area behind the Memorial Gates is also complete, other than a big rake off and protruding tree stumps cut down to ground level.
- Tony has erected a compost area in the bottom right hand corner of the field so gathered leaves can be place here instead of burning.
So all that is left for us to do on the BIG FINAL PUSH Sunday 18th January 2009 arrive 08.00am is;
- Cut back and trim the remaining left hand side (already half done).
- Cut back and trim the frontage area (minimal work)
- Strip trees of Ivy
- A Massive rake off around the club house perimeter and Nissan hut area.
- Cutting tree stumps to ground level.
- Bonfire.
If everyone turns out armed with rakes, cutters, gloves etc and we get started by 08.30 and work hard but steady I feel we can complete the ground work in one day. But that is only if EVERYONE turns up!!!!!!!!!!!
If any one is able to bring a wheelie Bin (Mick and I will bring one), but the more we have the easier the work will be as this will speed up the raking off programme instead of using the one wheel barrow that we have to move debris. Also if anyone can bring ladders for reaching up the higher level of trees for Ivy removal this will also be a big help.
This will then leave the following jobs to do when the better weather picks up;
- Tidy the Nissan Hut
- Repair club house roof
- Treat bike hut roof with Bitumen
- Complete fence treatment on front gates
- Renew putty in window frames
- Rub down and paint window frames
We may have to look at erecting sum fencing up behind the Nissan hut to segregate ourselves from our neighbours.
In the meantime time we will start work on the club house interior, Hands will be needed but these jobs shouldn’t take long at all to complete;
Jobs to be done
- Painting
- Floor lying in bedroom,
- Wood work
- General tidy up
- Convert shower in men’s WC area into another WC.
We will need to look at replacing the flooring in the lounge area of the club house as the existing flooring is lifting and It wont be long before someone takes a trip over it. If you have any suggestions to suitable flooring then please put you ideas forward!!
See you Sunday 18th Jan Bright and Early